Lean Manufacturing with SIMUL8 by Allen Lwowski
Decreasing inventory levels, while maintaining acceptable machine utilization and throughput, is one of the greatest challenges facing production managers today. Adjacent machines on a production line often operate at different speeds. Thus some “buffer” inventory is often required, to ensure that parts are always available for downstream machines. These buffers prevent the starvation of downstream machines and the ensuing reduction of throughput. As the variation in machine cycle times increases, the size of the buffers must also increase, to combat the increased likelihood of machine starvation.
The high inventory levels created by this approach lead to higher inventory storage costs, as well as longer times for orders to move through the system. As consumers demand ever-faster response times, production managers must identify new ways of reducing lead times without sacrificing throughput.
By applying Lean Manufacturing techniques, it is possible to reduce Work-In-Progress (WIP) and lead times without significantly lowering machine utilization and throughput. Lean Manufacturing replaces the traditional “push” system of production with a “pull” system. In a push system, the focus of production is on the upstream machines; downstream machines perform work as soon as parts are available from those upstream. In a pull system however, the focus shifts to the downstream machines; upstream machines only perform work when downstream ones request it. The result is a reduction in required inventory levels, as well as shorter lead times throughout the system.
This article demonstrates how SIMUL8 can be used to simulate both push and pull systems. It also explains how SIMUL8 can be used to analyze a production system using the key performance indicators (KPI’s):
- Lead times
- WIP Levels
- Throughput
The Traditional “Push” System
SIMUL8 models operate by default under a push workflow scenario. Work Centers process work items as they become available, on a first in first out basis. Under these circumstances, restricting inventory levels can negatively impact system performance. The following example demonstrates the tradeoff between WIP and lead time, and machine utilization and throughput.
Figure 1 shows a simple two process simulation with buffers using the default parameters provided by SIMUL8.
 |
Figure 1. A simple two-process push system simulation. |
In order to analyze the simulation, the results listed below are added to the Results Summary sheet, and a trial is performed.
- Work Exit Point: Number Completed, Average Time in System
- Work Centers: Working %
- Storage Bins: Average Queue Size
To evaluate the impact of reducing inventory, a new trial is performed and the results examined again after capacities of all storage bins are lowered to one.
To compare results of the different trials select the “Compare Results” button on the Result Summary. As shown in the figure below, the results demonstrate that in a push system, decreasing inventory levels results in decreased throughput and machine utilization.
 |
Figure 2. Sample results from two trials. |
Simulating “Pull” Systems using Kanbans
Lean Manufacturing techniques are being used to introduce pull systems into manufacturing facilities. The essential characteristic of all pull systems is that upstream operations process only enough material to satisfy the needs of downstream operations. Instead of producing to satisfy total demand from a forecast, upstream operations are regulated to produce in accordance to downstream requirements. These requirements are typically communicated through a physical card known as a “Kanban”.
 |
Figure
3. A two-process pull system simulation. |
In a Kanban system, the upstream process waits for a signal from a downstream operation to begin work. This working relationship can be simulated in SIMUL8 using the following four steps:
- Remove Queue for Work Center 1, and set the Work Entry Arrivals to Unlimited.
- Create a Storage Bin (call it Kanban Post) that feeds Work Center 1, with a Start-up Inventory of 1.
- Set Work Center 1 to collect both a Kanban from this Storage Bin and a Work Item from the Work Entry point. This will restrict Work Center 1 from working if there is no Kanban available.
- As soon as work commences in Work Center 2, use the following Visual Logic command to return a Kanban to the Kanban Post.
 |
Figure 4.Visual Logic command to be inserted either: (a) in Work Center 2’s Route-In After Loading logic, or (b) in the Storage Bin’s After Exit logic (if using SIMUL8 2005). |
New for SIMUL8 2005: Alternatively, the new Storage Bin After Exit Logic introduced in SIMUL8 2005 can be used to trigger this event.
Using the Kanban, the system will be able to achieve lower lead times, due to reduced inventory levels before and after Work Center 1. The pull system eliminates the need to limit the inventory level in the buffer between Work Centers 1 and 2. Work Center 1 will only produce the amount of inventory required to keep Work Center 2 busy, without overproducing.
It is possible to experiment with the number of Kanbans within the system to further improve work flow and throughput, as shown below. This simple demonstration is at the heart of the popular Supermarket concept in lean manufacturing.
 |
Figure 5. Results Comparison from a 1 and 2 Kanban system. |
The simulation results show the advantages of a pull system. By limiting the need for large buffers between machines, the Kanbans effectively reduce inventory but still maintain high machine utilization.
SIMUL8 can be used to design production pull systems by analyzing the process before and after the introduction of Kanbans in a risk-free “what-if” setting. With this tool you can answer questions such as:
- How many Kanbans do I need (in a supermarket) to achieve a 99% service level?
- To which upstream process should I send the Kanbans to optimize response times?
- What would be the effect of combining a number of processes into one work cell?
Value Stream Mapping with Lean-Modeler
Value Stream Mapping (VSM) is a technique introduced by the Lean Enterprise Institute to help organizations implement Lean. To help users who want to easily simulate their existing maps Visual8 and SIMUL8 have recently released a VSM tool called Lean-Modeler. Using industry-standard VSM objects built from SIMUL8 Components, Lean-Modeler allows you to create working simulation models based on VSM concepts. These VSM objects (including Supermarkets, Workcells, and others) enable users to simulate their current state operations, and observe the flow of work over time. A future state can subsequently be created, making it easy to perform “what-if” analyses that show the real value of the lean initiative.
Lean-Modeler also contains a number of detailed reports that provide key financial and operational performance results, showing where waste can be eliminated from your process. Testing lean initiatives is as simple as re-arranging or adding new objects to the simulation, such as supermarkets or batch processes.
With a detailed and accurate simulation of your operation’s value stream, you can demonstrate the true value of your lean recommendations to all levels of your organization
For more information visit the Lean-Modeler website.
Free Downloads
New SIMUL8 Service Pack Version 2005 Build 911
A new service pack for SIMUL8 2005 has been released. It fixes a few issues including resolving problems with installing on Windows 98.
Download the Service Pack | Full Details of What's in the Service Pack
Hints and Tips
SIMUL8 has many keyboard shortcuts that can save you lots of time. Here are some the best and least well known.
- Ctrl+F9 - Start or stop your simulation running.
- Ctrl+F8 - Step your simulation forward one event.
- Ctrl+G - Run the simulation to a specific time.
- F1 - Open the help files.
- Shift+P - Run in presentation mode (New in SIMUL8 2005).
- Ctrl+L - Open list of all Visual Logic in simulation.
- F11 - Open/Close QuickView
- Ctrl+Alt+W - Open the Watch Window.
- Ctrl+Left Mouse Click on Show Spreadsheet button - Lets you set the spreadsheet to be displayed when the button is clicked.
- Ctrl+I - Opens the Information Store
- Ctrl+Shift+Left Mouse Click on a Work Item - Opens a dialog with information about the Work Item.
- Ctrl+Alt - If SIMUL8 is processing a section of Visual Logic this stops the execution and opens the Visual Logic window.
If you have any questions generated from, or comments about this
newsletter then email Newsletter@SIMUL8.com
|